HULL TO
DECK CONSTRUCTION The deck and liner are first bonded together with resin and
mat. Second, the hull and deck are fastened together with stainless
steel #10 screws nearly every 8” to retain proper height; then the
entire joint is chalked with marine chalking. Third, the hull, deck
and liner are mechanically fastened with 1/4” stainless steel machine
screws, SS washers with SS nylon lock nuts every 8”.